MADE IN TEXAS

Powered pads for
modular compute.

P2 develops powered land for modular data centers. We secure the sites, build dedicated on-site power, and deliver fiber-connected pads that are ready for your modules.

Campus in development. Capacity, timing, and terms are subject to permitting, approvals, and final agreements.

Fenced modular compute pad beside the access road

4,000

Tier 1 acres under control

5

Sites

3 GW

Pipeline

The model

Powered pads, built for modules.

The hardest part of any deployment is power. P2 is building it first. Land, power delivery, civil works, and fiber are designed to be in place before you arrive, so your team can focus on what goes inside the envelope.

01

Power planned for every pad

Each pad is designed for a dedicated 10 MW dual-feed connection to on-site generation, built to avoid the utility interconnection queue.

02

Built for modules

Pads are graded, drained, and sized for containerized halls, prefabricated skids, and custom modular builds.

03

Scale in 10 MW steps

Start with one pad and add adjacent capacity in phases as your deployment grows.

04

Own your pad

You own the pad and everything on it. No shared halls, no landlord in your white space, no colocation contract over your hardware. Power is delivered through a long-term power service agreement.

Power

How power works.

Power is the product. This is how we're building it.

01

Campus-scale generation, phased to demand

A central on-site power plant is planned to come online in blocks matched to pad takedowns, so capacity grows with the campus instead of sitting idle ahead of it.

02

Redundancy at the plant, not on your pad

Each pad is designed to receive two independent 34.5 kV feeds from separate buses, backed by redundant generation at the plant. The goal is that pad owners don't need their own diesel backup.

03

A dedicated power provider

Generation is planned to be owned and operated by a dedicated power provider. Each pad owner contracts directly for long-term power service.

04

Terms built to be financed

We're structuring power service around what owners and their lenders need: a long contract term, defined availability standards, and assignability on sale or financing. Terms are shared under NDA.

Delivery standard

A clear line at the equipment envelope.

We deliver power, fiber, grade and access. You set everything inside the equipment envelope.

Delivered by P2

  • 10 MW dedicated dual-feed medium-voltage connection (34.5 kV), served by on-site generation
  • Dual-path diverse dark fiber conduits to the property boundary
  • Graded pad with engineered drainage
  • Dedicated heavy-haul paved access road
  • Long-term power service agreement

Brought by the pad owner

  • Modular data halls in 1–2 MW increments
  • UPS and ride-through battery storage
  • Closed-loop chillers or direct-to-chip liquid cooling heat rejection
  • Compute racks and IT hardware

Campus-level generation redundancy is designed so pads don't require on-site diesel generation. Owner-supplied backup generation, if any, is subject to campus design standards and permitting.

Customer equipment envelopehalls · storage · cooling34.5 kV · Feed A / BFiber path AFiber path BSetbackHeavy-haul access road

Pad anatomy

A typical 10 MW pad.

Power arrives as two independent 34.5 kV feeds. Fiber enters from two directions. Setbacks protect access and maintenance clearance around the equipment envelope.

Compatible form factors

Standardized ISO containersPrefabricated steel skidsCustom modular halls

Phasing

Released in phases.

The campus is planned in phases. Pads are released as each power block advances. The phase schedule, available pad positions, and takedown terms are shared with qualified parties under NDA.

Reserve Pads

Who it serves

Built for teams that want to own their capacity.

Powered capacity you own outright, ready for modules the day they arrive.

Modular data center operators

Deploy your platform on a powered pad and keep full control of design and operations.

Infrastructure and capital partners

Acquire pads as long-term assets, then lease to neoclouds and inference tenants.

Neoclouds

Stand up GPU capacity in 10 MW steps without waiting on a utility queue.

Enterprise inference clusters

Own dedicated inference capacity outright instead of renting it.

Built to be welcomed

A campus that works for its neighbors.

Data center growth increasingly depends on community support. P2 is being designed to earn it: a blended on-site generation mix, no diesel generator fleets across the campus, and site design focused on noise, setbacks, and screening.

FAQ

Common questions.

Is this colocation?+

No. You own the pad and everything on it. P2 delivers powered, connected, graded land. You deploy and operate your own modules.

Where does the power come from?+

Dedicated on-site generation, planned to be owned and operated by a dedicated power provider and delivered to each pad over two independent feeds.

Do I need backup generators?+

The campus is designed with redundancy at the plant so pads don't need their own diesel backup. Engineering details are available under NDA.

When can I energize?+

Energization timing depends on the phase. Current phase timing is shared under NDA.

Can I take more than one pad?+

Yes. Pads can be taken individually or in groups, subject to phase availability.

Where are the sites?+

We have five sites in development throughout the Dallas–Fort Worth area. Specific locations are disclosed under NDA.

Reserve

Reserve pads.

Pads are offered in 10 MW increments. Choose your capacity and send a reservation request. Our team will follow up with availability and next steps.